The
HVAC consists of 415 tons of roof mounted DX cooling VAV units, 100 VAV boxes
with electric reheat, and a state of the art controls. Plumbing consists of several
large restrooms. Computer power and building power is backed up with 300 KVA Uninterrupted
Power Sources and 900 KW of emergency back up generators to power the entire building
in the event of a power failure.
Managed this project during a critical
timeline & a challenged budget. Integrated timely delivery.