Subcontractor: Al Panchieri

Date Job Assigned: Feb / 22 /2015

 CUT SHEET
#1

Delivery Requested By Feb / 28/ 2015

Actual Delivery Date ___/___/_____

 I need this form before I can pay you 

I am required to keep it for accounting purposes, and I suggest you keep a copy for your records. When you are ready to deliver, contact us* to get a delivery time.

delivery date set: _____/_____/_____

from _____am/pm to_______am/pm

If your work is ready for delivery on or before date above, delivery will be set within 48 hrs. of receiving your notice. Work is paid when delivered. Please return any panel drop-offs larger than 4x15", and any small diameter tube drop-offs longer than 9."

*You can contact me most easily by clicking on the contact us button on the opening page of our website.
item
pcs. needed
pcs. delivered
pay/piece
total

7/16 wafer 9x9"(5 holes)

0

00

A

0

7/16 wafer 12x12"(5 holes)

o

o

o

o

7/16 wafer 16x16"(5 holes)

0

0

A A

0

7/16 wafer 18x18"(5 holes)

o

o

o

o

5/8 ply 16x16"(5 holes)

0

00

A

0

5/8 ply 18x18"(5 holes)

o

o

o

o

5/8 ply 24x24"(5 holes)

0

0

A

0

3/4 ply 24x24" (w/rim)

o

o

o

o

3-4" tube 16" length

0

0

0

3-4" tube 16.75" length

40

o

.15

o

3-4" tube 19.25" length

0

0

.15

0

3-4" tube 23.5" length
40
 
.15
 
3-4" tube 24.0" length
40
.15

3-4" tube 29.0" length

40

o

.15

o

3-4" tube 30" length

40

0

.15

0

3-4" tube 31.5" length

o

o

o

o plugs drilled 1 hole

o

o

o

o

plugs drilled 2 hole

0

0

0

0

plugs drilled 3 hole

o

o

o

o

plugs insert nut

0o

0

0o

0

curved perch 18" (1/4 diam)

o

o

o

o

curved perch 18" (1/3 diam)

o

o

o

o

curved perch 22" (1/4 diam)

o

o

o

o

SUBTOTALS

o

o

N/A

o

Cash Received (sign here ): Date:

 TOTAL

o